Roads and bridges

  • Footbridge in Gaj over the Zakopianka route

    The footbridge over the Zakopianka route in Gaj is another object over the busy national road no. 7. The investment has increased the safety of both the locals and drivers. The structure of the bridge consists of four steel pylons (two on each side o...

  • Poznań Western Bypass (stage II)

    Skanska was responsible for another stretch of Poznań’s western bypass – from Rokietnica to Swadzim. Previously, the company completed the first stage, a 14.3 km stretch from Swadzim to Głuchowo. The western bypass has eliminated some of ...

  • A pedestrian & cyclist bridge over the San river

    Located in the center of Przemyśl, a pedestrian & cyclist bridge over the San river, connected two waterfronts – Józefa Piłsudskiego and Saint Pope John Paul II. The river crossing was built as a part of the project called “Cyc...

  • Construction of the road S-8 between Wroclaw-Psie Pole-Sycow, second phase connecting Olesnica

    The value of the project, being built within the frameowrk „Design and build” is over 468,6 mln zloty. Skanska’s task was to schedule subcontracting projects for all of the construction work and to build the 25 km long stretch of th...

  • A1 Motorway

    In Poland, Skanska is at the heart of one of Europe's largest road projects, the Autostrada A1, or European Road E75. The motorway follows a 152 km north-south route divided into two phases, linking one of Poland's largest cities, Gdansk, ...

  • Reconstruction of national road No. 4 on the section Pilzno - Ropczyce

    In 2008 the Rzeszów branch of the General Directorate of State Roads and Motorways started modernization of a state road in the Podkarpacie region - the largest in its history. The project valued at almost PLN 600 mln was divided into four par...

  • Reconstruction of the bridge over the Wisłok River in Trzebownisko

    In 2011 Skanska Skanska completed reconstruction of the  four span bridge over the Wislok river in Trzebownisko near Rzeszow. Bridge with total length of more than 85 metres is located within the county road no 1383 Trzebownisko – Łąka &nd...

  • Construction of south by-pass of Siewierz in the route of state road No 78

    The investment included construction of a 5,7 km long two-lane road, four viaducts over local roads, one viaduct over railway line and one over state road No 1 as well as two bridge facilities over the Czarna Przemsza river. The newly constructed by-...

  • Reconstruction of the voivodship road No. 881 on the section Lancut - Kanczuga

    In 2010 Skanska completed modernization 16-kilometers long  section of the provincial road No. 881 between Lancut and Kanczuga. This investment with total gross amount of more than 41 mln zloty was realized for our regular customer – ...

  • Western Ring Road of Poznań

    Construction of West Ring Road included 14,3 kilometer road section from Swadzim to Gluchow. Contract was realized in consortium with Intercor. Branch of the General Management for National Roads and Motorways in Poznan was the investor.   Weste...