Scope of works included construction of a taxiway for airplanes with sections connecting it to the parallel runway. We also reconstructed the underground infrastructure (power supply network, telecommunication network and storm rain water collecting system) as well as the surface of two connectors. Realization of surface dewatering and navigation lighting systems, horizontal and vertical marking as well as telecommunication and finishing works were also among our tasks. Construction works were executed on the operating facility and were divided into three stages - right after completion each of them was handed over for use.