Tenant’s Guide

Tenant’s Guide

cp_logotyp_rgb (2)

Powstańców Śląskich 13 Street, 53-332 Wroclaw

Centrum Południe meets certification requirements: LEED Platinum, WELL Gold and Building without Barriers (ongoing process)

Location:

  • Located in Wrocław, within the area bordered by Gwiaździsta, Szczęśliwa, and Powstańców Śląskich Streets
  • Tram lines: 2, 3, 4, 5, 6, 7, 9, 10, 12, 13, 17, 18, 19, 20, 23 
  • Bus lines: A, 122, 125, 144, 241, 247, 248, 257;
  • Nearest railway stations: Wrocław Main Railway Station (15min walk)

Building information:

  • Class A office facility with retail and service functions
  • 13 office floors
  • 2,5 underground floors
  • 209 parking spaces
  • 162 bicycle racks
  • Investor, owner: Skanska Commercial Development Europe

Centrum Południe (CP3)

Useful contacts

Leasing & Asset Manager

Karolina Jamróz
Skanska Office Unit
+48 604 955 381
Contact

Property Manager

Magdalena Glazunów
CBRE
+48 722 202 932
Contact

Facility Technical Manager

Michal Rosiecki  
Apleona
+48 532 754 765
Contact

Reporting defects: Contact

Security

Agencja Ochrony SERIS KONSALNET
+48 513 498 228
Contact

Cleaning Coordinator

PIANGO

+48 601 191 499

 

Navigating the building

The main entrance is accessible from the Powstańców Śląskich Street. Another is located on the side of Gwiaździsta Street and is restricted by access control just like the entrance from the garage level.

Entrance to the building

Pedestrian traffic flows through a public entrance located on the ground floor. The building’s reception desk operates from 7:00 a.m. to 7:00 p.m. Monday to Friday.

External visitors

The building reception is currently managed by the main tenant of the property BNY.

Access control

Access to the elevators, staircases, elevator lobbies, and tenant spaces is preceded by a check of the individual’s access rights using the access control card reader. To use the elevator to any floor, an access card must be read at the card reader, and the button corresponding to the desired floor must be pressed. Descending from any floor to level 0 does not require the use of an access card.

Entry to the underground parking

Individuals using the underground parking enter the premises by scanning their access rights on the access control reader, QR code reader at the barrier, or via automatic license plate recognition by the camera. Similarly, when exiting the parking lot, the barrier opens after scanning the access card. It is also possible to open the barrier via a button operated by the security personnel.

Deliveries

are operated from Powstańców Śląskich Street using designated loading routes and marked freight elevators, or via the underground garage.

  • Large deliveries: between 6:00 PM and 6:00 AM.
  • Only vehicles weighing no more than 3.5 tons may enter the garage.
  • Max height of cars descending into the underground garage
  • Number of cargo elevators: 1
  • Cargo elevator: max load of 2500 kg
  • Door width: 120 cm, height: 210 cm
  • Cabin width: 180 cm, height 230 cm, depth 270 cm
Read more

Parking

Access to the car park level is subject to the building’s access control rules. Employees are given the appropriate authority in consultation with the tenant’s representative.

Tenants' guests receive the corresponding authorization by assigning them in Connected by Skanska app.

How to get to the underground parking lot?

The exit to the parking area is through a ramp from Powstańców Śląskich Street

How many parking spaces does Centrum Południe (CP3) provide?

There are 85 parking spaces available to tenants, including 4 for people with disabilities, located in 2,5 levels of underground parking.

Is it possible to charge electric cars in Centrum Południe (CP3)?

All parking spaces are equipped to charge electric cars, including 2 fast-charging spots located on -1.

What are the rules in the underground parking?

  • LPG-fuelled vehicles are permitted to enter.
  • The user is obliged to obey the traffic signs and other information signs posted in the car park.
  • There is a speed limit of 10 km/h.
  • The user is obliged to park the vehicle in the parking space indicated by the system. It is forbidden to park vehicles outside the designated areas, i.e. on the entrances and places designated for passing.
  • Blocking the gate, doors, emergency exits, as well as storage of any materials, fuel, tyres, furniture, etc. is strictly prohibited.
  • Smoking (including electronic cigarettes) and consumption of beverages containing alcohol is strictly prohibited.

 

Bike amenities

There is an extensive bike infrastructure both inside and outside the building.

How many bike racks does Centrum Południe (CP3) offer?

Centrum Południe (CP3) provides 162 bike racks.
150 racks in the bike room in the garage and 12 racks outside the building.

Where is the entrance to the bike room ?

Enter the building from Gwiaździsta Street near the basketball court. Follow the signage and go to the garage elevator.

Are there any changing rooms and showers available in the building?

There are changing rooms, as well as 8 showers for cyclists. Showers are located on the same floor as the bike storage and are secured by the access control system.

Do changing rooms contain lockers?

Bicycle lockers are equipped with key-locked cabinets. Keys for the lockers will be issued at the security desk.

Can electric bikes be parked in the bike room?

Neither scooters nor electric bikes are allowed to park in the bike room on -1 or -0,5 floor. Users are required to park outside the building in designated areas, in a manner that does not restrict pedestrian traffic.

Get to know your new location!
Centrum Południe (CP3)

Facilities for people with disabilities

  • Access to the building has been adapted for people with limited mobility.
  • Threshold-free main entrance
  • Intercom at the main entrance
  • Gate of appropriate width at tripods
  • Adaptation of elevators
  • Parking spaces in the underground garage
  • Switches at an adapted height
  • Signage in Braille
  • Sign language interpreter at the reception desk
  • Disabled toilet alarm system to signal the need for assistance
  • The lobby of the building offers a babysitter's room and public accessible toilets.

Sustainable workplace

  • Top quality indoor environment to take care of users' health and wellbeing
  • Efficient air conditioning based on chilled beams
  • Ventilation system providing 30% more fresh air; constant supply of fresh air
  • Humidity level of 40-60%
  • Panel for cost-saving control of air conditioning in tenants' space
  • LED lighting and motion sensors; lighting management system; daylight control system
  • Gray water system
  • The water in Centrum Południe (CP3) has been tested and is drinkable.

Sustainable building

  • A smart BMS (Building Management System) that monitors and controls building systems and equipment.
  • Automatic lighting shutdown in common areas such as corridors and lobbies during nights and weekends, in line with the current lighting schedule. Motion sensors in designated areas such as elevator lobbies, the reception area, and security rooms.
  • A cooling installation using a free cooling system and efficient filters in the ventilation units, ensuring high indoor air quality.
  • A greywater system for toilet and urinal flushing, which reduces potable water usage by reusing water from sinks and showers. The system also allows for the use of rainwater.
  • Water efficient fittings, grey rainwater reusable system, retention ponds
  • Placemaking approach​. Basketball court, recreational swings
  • Biodiversity. No harmful pesticides and herbicides for the care of green areas
  • LED lighting, free-cooling on chiller, adiabatic humidification
  • Certificates: LEED Platinum, WELL Gold

Connected by Skanska

Self-developed office building management system that integrates innovative building technologies. It offers a mobile application for daily building users, as well as a web portal for tenant administrators and property owners.

  • Mobile access: a convenient alternative to the traditional plastic card. Provides the ability to enter the building and move around inside (e.g. opening doors, calling the elevator) using a virtual access card assigned to the user's Bluetooth® or NFC-enabled phone.
  • Parking: a smart parking system allows the user to enter the parking lot with the help of a camera that reads license plates and prompts for a designated space. For the tenant administrator, it is a tool for smart and dynamic management of parking space.
  • Virtual reception desk: tenants can send their guests a virtual invitation to a meeting, containing a custom-generated QR code for access to the building, and reserve a parking space for them. The virtual reception desk informs the sender of the invitation that the guest has arrived.
Explore functionalities