c

Construction of taxiway parallel to the runway in the Gdansk Lech Walesa Airport

Developing the project

The taxiway has been designed as the asphalt pavement of the strip 23 m wide with reinforced shoulders on both sides,each 7.5 m wide. Taxiway length amounts to 2,6 km, whereas its surface with exit ways and reinforced shoulders is 126,500 m².

The project in figures

  •  excavations ~ 125 000 m3 
  •  embankments ~ 95 000 m3
  • surface ~ 178 000 m2
  •  built-in material:
  • crushed-stone aggregate ~ 70 000 t
  • mineral and asphalt mixes: ~ 110 000 t
Last updated: 8/16/2017

Search or filter all our projects

Result

loading