Submerged tunnel at Bjørvika (at the centre of Oslo)

Additional information

Before the tunnel was installed, a wall was created in a ditch across the Bjørvika. The dredging work, consisted of approx 600 000 cum masses, which was part of the contract.
Parts of the quay at Sørenga and Havnelageret had to be torn down in the process of building the tunnel. These quays were reinstalled when they finished the tunnelworks.